Tent installation in subzero temperatures

March 10th, 2015

Tasked with installing a 20,000-foot clearspan tent during sub-zero temperatures, snow fall and a bit of freezing rain at a Wisconsin construction site, American Pavilion’s winter crew finished the job in three days. The client needed a heavy-duty, cold-resistant construction tent so that a concrete pad could be poured and cured properly no matter the […]

Read More